Walking beam furnace
Location | Components |
Upstream production line |
|
Dute | |
Reheating of billets | |
| |
A- Re-heating furnace When developing furnace steel projects thermal and mechanical internal stresses that the furnace can encounter in its working period are taken into account. Both dilatations and shrinkages that will occur in refractory material and dilatations and shrinkages that will occur in the steel structure itself are balanced with the mechanisms which are applied to the system
Products: Type...............................................................................................................Billets Steel grades................................................................................................. Carbon Steel (Bisra 3) Sections .......................................................................................................150x150; 130x130; Lengt………………………………………………………...................…………12000 mm for rest of billets Maximum weight ......................................................................................... 3744 kg (200x200x12000 mm)
Reference product: Type ..............................................................................................................Billet Steel grade................................................................................................... Carbon Steel (Bisra 3) Dimensions.................................................................................................. 150x150x12000 mm Weight ..........................................................................................................2106 kg
Temperature conditions: Charging temperature for reference ............................................................ambient (25 ºC) Discharging temperature for reference ...................................................... 1150 ºC (on product surface)
Fuel: Natural gas with LCV................................................................................... 8600 kcal/Nm3 Charging method ....................................................................................... lateral by means of charging roller table and aligning pusher Billet arrangement.......................................................................................1 (12 m) Discharging method ................................................................................... lateral by means of discharging roller table and kick-off machines Features:
| |
B- Chimney Iron sheet chimney whose diameter and height calculation are made according to furnace capacity. | |
C- Recuperator Within the furnace, gases flow from the discharge end to the charge end and exit through the furnace up take located at the charge end to a refractory lined waste gas duct. The waste gases flow through the recuperator and the stack to the atmosphere. A damper valve system, for furnace pressure control, will be located in the waste gases flue, between the recuperator and the stack
|